About six months ago, we started a hydrogeological survey on the site here in Mulungwe, Zambia.
Today, we have started drilling work for the construction of a water supply system.
By the evening, we had reached a depth of 101 metres. Judging by the jet that comes out of the borehole during drilling, there is enough water.
The clinic on the site, the neighbouring school and the village population are to benefit from this project. Until now, there has been no clean water in Mulungwe.