Towards evening the first truck of the drilling company reached Abedju. It was loaded with some filter pipes and the drilling equipment. The other two with the compressor and other pipes are expected tomorrow morning.
Project Diary

Towards evening the first truck of the drilling company reached Abedju. It was loaded with some filter pipes and the drilling equipment. The other two with the compressor and other pipes are expected tomorrow morning.