Project Diary Preparation for the new Main Water Line Share: Preparations are currently underway for the laying of the new main water pipeline in Adi , DR Congo: a 1000 metre long trench is being dug from the reservoir to the elevated tank. A guard house is also being built at the pumping station.++ 31 December 2017 Previous article: Charity Christmas Cards Prev Next article: Running Water in the Hospital in Adi (DR Congo) Next