Preparations are currently underway for the laying of the new main water pipeline in Adi , DR Congo: a 1000 metre long trench is being dug from the reservoir to the elevated tank. A guard house is also being built at the pumping station.

Preparations are currently underway for the laying of the new main water pipeline in Adi , DR Congo: a 1000 metre long trench is being dug from the reservoir to the elevated tank. A guard house is also being built at the pumping station. + +