A small piece of the aisle to the drilling site still had to be cleared. As soon as this was done, the drilling company arrived with two trucks and the work could begin.
They had heavy equipment. With it, the drilling progressed quickly. After only three hours, they had reached a depth of 65m and hit water. Then the filter pipes were installed and the borehole closed. All in all, it took five and a half hours. The most important part of the work is done. +