By late afternoon, all the material needed for the drilling and the drilling team had finally arrived. The work is scheduled to start early the next morning.
By late afternoon, all the material needed for the drilling and the drilling team had finally arrived. The work is scheduled to start early the next morning.
Institute Water for Africa e.V.
Silcherstr. 74
71384 Weinstadt, Germany
write us
Evangelische Bank eG
IBAN:
DE76 5206 0410 0005 0240 13
BIC:
GENO DE F1 EK1