Select your language

The drill eats into the ground. Soil sprays out.

Drilling will start on time. After three hours 21m is reached and it turns out that a 7 inch pipe is missing.

It takes six hours until it arrives from nearby Ariwana. Until the evening, the borehole is cleaned of mud and pipes are inserted. Tomorrow the borehole will be drilled deeper, then through a layer of rock.

Address

Institute Water for Africa e.V.
Silcherstr. 74
71384 Weinstadt, Germany
write us

Donations Account

Evangelische Bank eG
IBAN:
DE76 5206 0410 0005 0240 13
BIC:
GENO DE F1 EK1

Newsletter

Follow us