A small jet of water from the borehole

Yesterday we started the drilling work at the Nursery and Primary School in Adyangowe. In the evening everything was ready. But then came the surprise: hardly any water came out of the borehole - even though there was a lot of water during the drilling work.

After some consideration, we came to the conclusion that the filter pipes were not optimally arranged. So we took all the pipes and the gravel out of the borehole again. Then the pipes were reinstalled in a different order.