Select your language

LWK with drilling rig and filter pipes on the loading area

Towards evening the first truck of the drilling company reached Abedju. It was loaded with some filter pipes and the drilling equipment. The other two with the compressor and other pipes are expected tomorrow morning.

Stay up to date – subscribe to our newsletter now

Get fascinating insights into our aid projects in Africa – 2–3 times a year. You can unsubscribe at any time.

Donations Account

Beneficiary:
Institute Water for Africa e.V.
Bank:
Evangelische Bank Kassel
IBAN:
DE76 5206 0410 0005 0240 13
BIC:
GENO DE F1 EK1

Donate Now