Today, after 3 days of construction, the project in Muhingo was successfully completed. A branch was added to the existing water pipe. At its end a second tapping point was built. This shortens the daily time to fetch water considerably.
Today, after 3 days of construction, the project in Muhingo was successfully completed. A branch was added to the existing water pipe. At its end a second tapping point was built. This shortens the daily time to fetch water considerably.
Institute Water for Africa e.V.
Silcherstr. 74
71384 Weinstadt, Germany
write us
Evangelische Bank eG
IBAN:
DE76 5206 0410 0005 0240 13
BIC:
GENO DE F1 EK1