Select your language

Hospital site on the other side of the valley

The situation in the hospital in Adja has worsened again since our last visit. A hospital ward can no longer be used since the ceiling collapsed.

The patient rooms are in a desolate state. The construction of a water supply for this hospital in Adja is planned as soon as the project at the missionary carnival in Abedju is completed. The situation is worst in Adja. However, it will be a logistical challenge to transport the drilling rig and then all the equipment there. The preparatory surveying work has already been carried out.

Address

Institute Water for Africa e.V.
Silcherstr. 74
71384 Weinstadt, Germany
write us

Donations Account

Evangelische Bank eG
IBAN:
DE76 5206 0410 0005 0240 13
BIC:
GENO DE F1 EK1

Donate

Newsletter

Follow us on

Instagram

YouTube

Facebook