As-built plan, irrigation project, 3.9 hectares, drilling sites, VES method, Vertical Electrical Sounding, water extraction, irrigation, drilling  Two construction workers in the field, one standing, the other kneeling and hammering a metal probe into the dry ground.

Yesterday we successfully completed a comprehensive as-built plan for a 3.9 hectare irrigation area. The optimal positions for three boreholes were determined. The VES (Vertical Electrical Sounding) method was used to precisely determine the drilling locations. The drilling points are positioned in such a way that they do not interfere with each other in order to ensure maximum water extraction.