also removed a lot of sand. At the end of the 24-hour pumping test, the well had become 31m deep again. Its capacity of 1,100 litres of water per hour is too low to be able to establish a water supply.
Hydrogeological Survey For a New Well
As the well with the existing jump pump does not provide enough water for a water supply, a new well has to be drilled.
In order to find the most suitable location on the mission site, we have carried out a hydrogeological survey. We marked two locations so that they could be found later by the drilling team.
In order to find the most suitable location on the mission site, we have carried out a hydrogeological survey. We marked two locations so that they could be found later by the drilling team.